Units
Cinapse will not notify you if the character is scheduled on two units on the same day at this time, but if you have two units filming two separate episodes, or even two episodes on the same unit on the same day, that will automatically be indicated on the Day out of Days. I suggest this as an update — it would be very useful. Last year i worked on Fuzzlecheck for a 40-episode production, and this feature was very useful. Another suggestion: split panels, stripboards Unit 1 and Unit 2. This way I can work with both units in parallel, scrolling one side of the shooting schedule to search for a scene, for example.
1
·
Stripboard Manager
·
under review
Powered by Canny